Tender Status · Sri Lanka
Tender Status
Track 266 projects across every procurement stage
open to everyone — edit Tender Status and Planned LOA Date directly.
Updated 2026-11-04Live
Tender Breakdown · Province
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 153 | 94% | 144 | 9 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 39 | 23% | 9 | 30 | — | — | 4 | 2 | 8 | 13 | 3 | 2 | 1 | 2 | 8 | 5 | 12 | — | |
| DC - Slope | 53 | 19% | 10 | 43 | — | — | 9 | 4 | 3 | 18 | 3 | 3 | 5 | 8 | 10 | 11 | 2 | — | |
| PD(CP) - Slope | 21 | 38% | 8 | 13 | 1 | — | 4 | — | — | 6 | 2 | — | — | — | — | — | — | — | |
| All Categories | 266 | 64% | 171 | 95 | 1 | 0 | 17 | 6 | 11 | 37 | 8 | 5 | 6 | 10 | 18 | 16 | 14 | 0 |
Central Province· 57 awarded of 131 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 32 | 97% | 31 | 1 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 26 | 31% | 8 | 18 | — | — | 3 | — | 5 | 8 | 2 | — | 1 | 2 | 6 | 3 | 6 | — | |
| DC - Slope | 52 | 19% | 10 | 42 | — | — | 9 | 3 | 3 | 18 | 3 | 3 | 5 | 8 | 10 | 11 | 1 | — | |
| PD(CP) - Slope | 21 | 38% | 8 | 13 | 1 | — | 4 | — | — | 6 | 2 | — | — | — | — | — | — | — | |
| Central Province | 131 | 44% | 57 | 74 | 1 | 0 | 16 | 3 | 8 | 32 | 7 | 3 | 6 | 10 | 16 | 14 | 7 | 0 |
Eastern Province· 9 awarded of 12 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 9 | 100% | 9 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 3 | 0% | — | 3 | — | — | 1 | 2 | — | — | — | — | — | — | 2 | — | 1 | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Eastern Province | 12 | 75% | 9 | 3 | 0 | 0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 1 | 0 |
North Central Province· 11 awarded of 11 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 11 | 100% | 11 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| North Central Province | 11 | 100% | 11 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
North Western Province· 12 awarded of 12 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 12 | 100% | 12 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| North Western Province | 12 | 100% | 12 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Northern Province· 6 awarded of 10 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 6 | 100% | 6 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 4 | 0% | — | 4 | — | — | — | — | 1 | 3 | — | — | — | — | — | — | 4 | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Northern Province | 10 | 60% | 6 | 4 | 0 | 0 | 0 | 0 | 1 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 4 | 0 |
Sabaragamuwa Province· 32 awarded of 37 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 36 | 89% | 32 | 4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 1 | 0% | — | 1 | — | — | — | 1 | — | — | — | — | — | — | — | — | 1 | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Sabaragamuwa Province | 37 | 86% | 32 | 5 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 |
Southern Province· 2 awarded of 2 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 2 | 100% | 2 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Southern Province | 2 | 100% | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Uva Province· 25 awarded of 28 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 25 | 100% | 25 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 3 | 0% | — | 3 | — | — | — | — | 2 | 1 | — | 1 | — | — | — | 2 | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Uva Province | 28 | 89% | 25 | 3 | 0 | 0 | 0 | 0 | 2 | 1 | 0 | 1 | 0 | 0 | 0 | 2 | 0 | 0 |
Western Province· 17 awarded of 23 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 20 | 80% | 16 | 4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 3 | 33% | 1 | 2 | — | — | — | — | — | 1 | 1 | 1 | — | — | — | — | 1 | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Western Province | 23 | 74% | 17 | 6 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 1 | 0 |
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 153 | 94% | 144 | 9 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 39 | 23% | 9 | 30 | — | — | 4 | 2 | 8 | 13 | 3 | 2 | 1 | 2 | 8 | 5 | 12 | — | |
| DC - Slope | 53 | 19% | 10 | 43 | — | — | 9 | 4 | 3 | 18 | 3 | 3 | 5 | 8 | 10 | 11 | 2 | — | |
| PD(CP) - Slope | 21 | 38% | 8 | 13 | 1 | — | 4 | — | — | 6 | 2 | — | — | — | — | — | — | — | |
| All Categories | 266 | 64% | 171 | 95 | 1 | 0 | 17 | 6 | 11 | 37 | 8 | 5 | 6 | 10 | 18 | 16 | 14 | 0 |
Ampara· 3 awarded of 5 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 3 | 100% | 3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 2 | 0% | — | 2 | — | — | — | 2 | — | — | — | — | — | — | 2 | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Ampara | 5 | 60% | 3 | 2 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 |
Anuradhapura· 6 awarded of 6 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 6 | 100% | 6 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Anuradhapura | 6 | 100% | 6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Badulla· 23 awarded of 26 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 23 | 100% | 23 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 3 | 0% | — | 3 | — | — | — | — | 2 | 1 | — | 1 | — | — | — | 2 | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Badulla | 26 | 88% | 23 | 3 | 0 | 0 | 0 | 0 | 2 | 1 | 0 | 1 | 0 | 0 | 0 | 2 | 0 | 0 |
Batticaloa· 1 awarded of 1 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 1 | 100% | 1 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Batticaloa | 1 | 100% | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Colombo· 8 awarded of 9 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 9 | 89% | 8 | 1 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Colombo | 9 | 89% | 8 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Galle· 2 awarded of 2 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 2 | 100% | 2 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Galle | 2 | 100% | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Gampaha· 9 awarded of 14 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 11 | 73% | 8 | 3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 3 | 33% | 1 | 2 | — | — | — | — | — | 1 | 1 | 1 | — | — | — | — | 1 | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Gampaha | 14 | 64% | 9 | 5 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 1 | 0 |
Jaffna· 2 awarded of 6 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 2 | 100% | 2 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 4 | 0% | — | 4 | — | — | — | — | 1 | 3 | — | — | — | — | — | — | 4 | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Jaffna | 6 | 33% | 2 | 4 | 0 | 0 | 0 | 0 | 1 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 4 | 0 |
Kandy· 23 awarded of 57 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 12 | 100% | 12 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 2 | 0% | — | 2 | — | — | — | — | 1 | 1 | — | — | 1 | — | 1 | — | — | — | |
| DC - Slope | 26 | 12% | 3 | 23 | — | — | 5 | 2 | 2 | 9 | 1 | 1 | 3 | 3 | 7 | 7 | — | — | |
| PD(CP) - Slope | 17 | 47% | 8 | 9 | 1 | — | 2 | — | — | 4 | 2 | — | — | — | — | — | — | — | |
| Kandy | 57 | 40% | 23 | 34 | 1 | 0 | 7 | 2 | 3 | 14 | 3 | 1 | 4 | 3 | 8 | 7 | 0 | 0 |
Kegalle· 10 awarded of 15 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 14 | 71% | 10 | 4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 1 | 0% | — | 1 | — | — | — | 1 | — | — | — | — | — | — | — | — | 1 | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Kegalle | 15 | 67% | 10 | 5 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 |
Kilinochchi· 1 awarded of 1 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 1 | 100% | 1 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Kilinochchi | 1 | 100% | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Kurunegala· 6 awarded of 6 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 6 | 100% | 6 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Kurunegala | 6 | 100% | 6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Mannar· 1 awarded of 1 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 1 | 100% | 1 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Mannar | 1 | 100% | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Matale· 10 awarded of 18 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 10 | 90% | 9 | 1 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 5 | 0% | — | 5 | — | — | — | — | 1 | 3 | 1 | — | — | 1 | 2 | 2 | — | — | |
| DC - Slope | 3 | 33% | 1 | 2 | — | — | — | — | — | 1 | 1 | 1 | — | 1 | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Matale | 18 | 56% | 10 | 8 | 0 | 0 | 0 | 0 | 1 | 4 | 2 | 1 | 0 | 2 | 2 | 2 | 0 | 0 |
Monaragala· 2 awarded of 2 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 2 | 100% | 2 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Monaragala | 2 | 100% | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Mullaitivu· 1 awarded of 1 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 1 | 100% | 1 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Mullaitivu | 1 | 100% | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Nuwara Eliya· 24 awarded of 56 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 10 | 100% | 10 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 19 | 42% | 8 | 11 | — | — | 3 | — | 3 | 4 | 1 | — | — | 1 | 3 | 1 | 6 | — | |
| DC - Slope | 23 | 26% | 6 | 17 | — | — | 4 | 1 | 1 | 8 | 1 | 1 | 2 | 4 | 3 | 4 | 1 | — | |
| PD(CP) - Slope | 4 | 0% | — | 4 | — | — | 2 | — | — | 2 | — | — | — | — | — | — | — | — | |
| Nuwara Eliya | 56 | 43% | 24 | 32 | 0 | 0 | 9 | 1 | 4 | 14 | 2 | 1 | 2 | 5 | 6 | 5 | 7 | 0 |
Polonnaruwa· 5 awarded of 5 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 5 | 100% | 5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Polonnaruwa | 5 | 100% | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Puttalam· 6 awarded of 6 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 6 | 100% | 6 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Puttalam | 6 | 100% | 6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Ratnapura· 22 awarded of 22 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 22 | 100% | 22 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Ratnapura | 22 | 100% | 22 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Trincomalee· 5 awarded of 6 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 5 | 100% | 5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 1 | 0% | — | 1 | — | — | 1 | — | — | — | — | — | — | — | — | — | 1 | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Trincomalee | 6 | 83% | 5 | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 |
Vavuniya· 1 awarded of 1 Open filtered view
| Category | Total | Awarded % | Awarded | To Be Awarded | Rebid | LOA Cancelled | Estimate Preparation and Procurement Planning | Document Review and Approval | Tender Publication and Bid Opening | Bid Evaluation and Tender Board Decision | Intention to Award, Appeal Period, and Contract Award | LOA Planned on or before 2026/10/15 | LOA Planned 2026/10/16 – 2026/10/31 | LOA Planned 2026/11/01 – 2026/11/15 | LOA Planned 2026/11/16 – 2026/11/30 | LOA Planned 2026/12/01 – 2026/12/15 | LOA Planned 2026/12/16 – 2026/12/31 | LOA Planned after 2026/12/31 | Open |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Emergency | 1 | 100% | 1 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Roads | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| DC - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| PD(CP) - Slope | 0 | 0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Vavuniya | 1 | 100% | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Tender Status
Filter tender pipeline
95 matching tenders
| S/N | Province | District | Contract No | Contract Description | Tender Status | Planned LOA Date | Action |
|---|---|---|---|---|---|---|---|
| 51 | Eastern Province | Trincomalee | RDA/DC/DRP/EP/TRI/TRI/34 | Rehabilitation / Improvement of Mullipothana Soorangal road 2+700 - 6+600 (B618) | Estimate Preparation and Procurement Planning | 2026-12-30 | |
| 52 | Eastern Province | Ampara | RDA/DC/DRP/EAS/AKK/AKK/32 | Rehabilitation / Improvement of Akkaraipattu – Varipathanchenai Road (B001) at 2+800, (10+500 - 12+750), (18+500-19+150)… | Document Review and Approval | 2026-11-25 | |
| 53 | Eastern Province | Ampara | RDA/DC/DPR/EAS/AKK/AKK/31 | Rehabilitation / Improvement of Colombo-Ratnapura-Wellawaya-Batticaloa Road (A004) (from 320+000 to 320 +510), Pottuvil … | Document Review and Approval | 2026-11-25 | |
| 54 | Western Province | Gampaha | RDA/DC/DRP/WP/GAM/NEG/17 | Rehabilitation/ Improvement of Peliyagoda Puttalam Road (18+000-28+000& 31+000-38+000) | Bid Evaluation and Tender Board Decision | 2026-12-20 | |
| 55 | Western Province | Gampaha | RDA/DC/DRP/WP/GAM/GAM/12 | Rehabilitation/ Improvement - Kelaniya - Mudungoda Road (6+500 - 29+100) | Intention to Award, Appeal Period, and Contract Award | 2026-10-11 | |
| 56 | Western Province | Gampaha | RDA/DRP/WP/GAM/GAM/14R | Rehabilitation / Improvement of Samurdhi Mawatha (5+000-7+000), Katunayake - Veyangoda Road (10+000-16+000), Ja ela - Ek… | Pending | — | |
| 57 | Western Province | Colombo | RDA/DRP/WP/COL/COL/08R | Rehabilitation / Improvement of Koralawella Egodauyana Road section 1 (0+000 - 3+000) | Pending | — | |
| 58 | Western Province | Gampaha | RDA/DRP/WP/GAM/NIT/24R | Rehabilitation / Improvement of Nall Mirigama Road (0+000-6+000), Pasyala Giriulla Road (10+000-11+000) and Fixing W- R… | Pending | — | |
| 59 | Western Province | Gampaha | RDA/DRP/WP/GAM/NEG/17R | Rehabilitation / Improvement of Negombo-Aluthepola Road (2+500-4+500) | Pending | — | |
| 60 | Sabaragamuwa Province | Kegalle | RDA/DRP/SAB/KEG/RUW/32R | Rehabilitation / Improvement of Meegammana - Kurupetta - Daigala Road (B603) and Thalduwa - Mewitigammana Road (B408) | Pending | — |
Showing 51–60 of 95 projects · page 6/10