DRRRP · Sri Lanka
Project Monitoring Dashboard
Comprehensive overview of 34 infrastructure projects
under the Disaster Rebuild and Rural Road Project — Sri Lanka.
Updated 2026-11-02 10:30Live
Graphs reflect current view:34 awarded · North Western Province · Kurunegala
85% awarded
0
Awarded
40 total projects 40 roads in portfolio
Awarded projects34
RR/RDA/18/25/01/NWP/KRGDevelopment of Egodagama Talakolawewa roadRR/RDA/18/25/02/NWP/KRGRoad from Parakumpura to Yaya 04RR/RDA/18/25/04/NWP/KRGThe road from Hunugallewa road junction to Madadenigama Hunugallewa Mahamaruwa Beligahaya to Mee Oya bridgeRR/RDA/18/25/07/NWP/KRGRoad from Moragolla Junction to Nabadewa Girilla Carpet Road via KirindaRR/RDA/18/25/08/NWP/KRGPaving of road from Nammuawa to Nagansole templeRR/RDA/18/25/09/NWP/KRGPaving the road from Pahala Galapitiyagama to Tharanagolla Sports GroundRR/RDA/18/25/11/NWP/KRGDevelopment of road from Dambulu Road to Havanathenna via EhelagollayaRR/RDA/18/25/16/NWP/KRGDevelopment of concrete road from near Wadawa temple to the lakeRR/RDA/18/25/22/NWP/KRGPaving of culverts and sidewalls at the necessary places on the road from near Moragane Samiti Hall to Siyambalaweva via Galkadulla.RR/RDA/18/25/24/NWP/KRGPaving and developing the road from Seelarathana Mawatha to Girana JunctionRR/RDA/18/25/104/NWP/KRGPinnagolla Junction to Kokowaththa Junction VIA AlakolapelessaRR/RDA/18/25/106/NWP/KRGThagahinna Temple RoadRR/RDA/18/25/NWP/KRG/10Uyandana YaggapitiyaRR/RDA/18/25/135/NWP/KRGKelegedara Gamameda Road (CTB Basaya Dawanaya wana) Kavudumunna, Kunumade, Hungan pitiya haraha diwena Margaya Kapat KirimaRR/RDA/18/25/136/NWP/KRGRanasinghe Hotel Asalin Koralaya Waththe sita Panwala Kubura Dakwa Diwena Margaya Kapat Kirima
+19 more…
Click to filter the awarded table
1,554.9M
1,554.9 Mn
Contract Value
Awarded projects34
RR/RDA/18/25/01/NWP/KRGDevelopment of Egodagama Talakolawewa roadRR/RDA/18/25/02/NWP/KRGRoad from Parakumpura to Yaya 04RR/RDA/18/25/04/NWP/KRGThe road from Hunugallewa road junction to Madadenigama Hunugallewa Mahamaruwa Beligahaya to Mee Oya bridgeRR/RDA/18/25/07/NWP/KRGRoad from Moragolla Junction to Nabadewa Girilla Carpet Road via KirindaRR/RDA/18/25/08/NWP/KRGPaving of road from Nammuawa to Nagansole templeRR/RDA/18/25/09/NWP/KRGPaving the road from Pahala Galapitiyagama to Tharanagolla Sports GroundRR/RDA/18/25/11/NWP/KRGDevelopment of road from Dambulu Road to Havanathenna via EhelagollayaRR/RDA/18/25/16/NWP/KRGDevelopment of concrete road from near Wadawa temple to the lakeRR/RDA/18/25/22/NWP/KRGPaving of culverts and sidewalls at the necessary places on the road from near Moragane Samiti Hall to Siyambalaweva via Galkadulla.RR/RDA/18/25/24/NWP/KRGPaving and developing the road from Seelarathana Mawatha to Girana JunctionRR/RDA/18/25/104/NWP/KRGPinnagolla Junction to Kokowaththa Junction VIA AlakolapelessaRR/RDA/18/25/106/NWP/KRGThagahinna Temple RoadRR/RDA/18/25/NWP/KRG/10Uyandana YaggapitiyaRR/RDA/18/25/135/NWP/KRGKelegedara Gamameda Road (CTB Basaya Dawanaya wana) Kavudumunna, Kunumade, Hungan pitiya haraha diwena Margaya Kapat KirimaRR/RDA/18/25/136/NWP/KRGRanasinghe Hotel Asalin Koralaya Waththe sita Panwala Kubura Dakwa Diwena Margaya Kapat Kirima
+19 more…
Click to filter the awarded table
Avg
85.8%
11
works in progress
22 completed
Avg Progress
Awarded projects34
RR/RDA/18/25/01/NWP/KRGDevelopment of Egodagama Talakolawewa roadRR/RDA/18/25/02/NWP/KRGRoad from Parakumpura to Yaya 04RR/RDA/18/25/04/NWP/KRGThe road from Hunugallewa road junction to Madadenigama Hunugallewa Mahamaruwa Beligahaya to Mee Oya bridgeRR/RDA/18/25/07/NWP/KRGRoad from Moragolla Junction to Nabadewa Girilla Carpet Road via KirindaRR/RDA/18/25/08/NWP/KRGPaving of road from Nammuawa to Nagansole templeRR/RDA/18/25/09/NWP/KRGPaving the road from Pahala Galapitiyagama to Tharanagolla Sports GroundRR/RDA/18/25/11/NWP/KRGDevelopment of road from Dambulu Road to Havanathenna via EhelagollayaRR/RDA/18/25/16/NWP/KRGDevelopment of concrete road from near Wadawa temple to the lakeRR/RDA/18/25/22/NWP/KRGPaving of culverts and sidewalls at the necessary places on the road from near Moragane Samiti Hall to Siyambalaweva via Galkadulla.RR/RDA/18/25/24/NWP/KRGPaving and developing the road from Seelarathana Mawatha to Girana JunctionRR/RDA/18/25/104/NWP/KRGPinnagolla Junction to Kokowaththa Junction VIA AlakolapelessaRR/RDA/18/25/106/NWP/KRGThagahinna Temple RoadRR/RDA/18/25/NWP/KRG/10Uyandana YaggapitiyaRR/RDA/18/25/135/NWP/KRGKelegedara Gamameda Road (CTB Basaya Dawanaya wana) Kavudumunna, Kunumade, Hungan pitiya haraha diwena Margaya Kapat KirimaRR/RDA/18/25/136/NWP/KRGRanasinghe Hotel Asalin Koralaya Waththe sita Panwala Kubura Dakwa Diwena Margaya Kapat Kirima
+19 more…
Click to filter the awarded table
844.2M
844.2 Mn
Total Expenditure (incl. VAT)
Awarded projects34
RR/RDA/18/25/01/NWP/KRGDevelopment of Egodagama Talakolawewa roadRR/RDA/18/25/02/NWP/KRGRoad from Parakumpura to Yaya 04RR/RDA/18/25/04/NWP/KRGThe road from Hunugallewa road junction to Madadenigama Hunugallewa Mahamaruwa Beligahaya to Mee Oya bridgeRR/RDA/18/25/07/NWP/KRGRoad from Moragolla Junction to Nabadewa Girilla Carpet Road via KirindaRR/RDA/18/25/08/NWP/KRGPaving of road from Nammuawa to Nagansole templeRR/RDA/18/25/09/NWP/KRGPaving the road from Pahala Galapitiyagama to Tharanagolla Sports GroundRR/RDA/18/25/11/NWP/KRGDevelopment of road from Dambulu Road to Havanathenna via EhelagollayaRR/RDA/18/25/16/NWP/KRGDevelopment of concrete road from near Wadawa temple to the lakeRR/RDA/18/25/22/NWP/KRGPaving of culverts and sidewalls at the necessary places on the road from near Moragane Samiti Hall to Siyambalaweva via Galkadulla.RR/RDA/18/25/24/NWP/KRGPaving and developing the road from Seelarathana Mawatha to Girana JunctionRR/RDA/18/25/104/NWP/KRGPinnagolla Junction to Kokowaththa Junction VIA AlakolapelessaRR/RDA/18/25/106/NWP/KRGThagahinna Temple RoadRR/RDA/18/25/NWP/KRG/10Uyandana YaggapitiyaRR/RDA/18/25/135/NWP/KRGKelegedara Gamameda Road (CTB Basaya Dawanaya wana) Kavudumunna, Kunumade, Hungan pitiya haraha diwena Margaya Kapat KirimaRR/RDA/18/25/136/NWP/KRGRanasinghe Hotel Asalin Koralaya Waththe sita Panwala Kubura Dakwa Diwena Margaya Kapat Kirima
+19 more…
Click to filter the awarded table
70.6%
0
On Progress
24 / 34 awarded
On Progress (incl. completed)24
RR/RDA/18/25/02/NWP/KRGRoad from Parakumpura to Yaya 04RR/RDA/18/25/08/NWP/KRGPaving of road from Nammuawa to Nagansole templeRR/RDA/18/25/16/NWP/KRGDevelopment of concrete road from near Wadawa temple to the lakeRR/RDA/18/25/24/NWP/KRGPaving and developing the road from Seelarathana Mawatha to Girana JunctionRR/RDA/18/25/104/NWP/KRGPinnagolla Junction to Kokowaththa Junction VIA AlakolapelessaRR/RDA/18/25/106/NWP/KRGThagahinna Temple RoadRR/RDA/18/25/NWP/KRG/10Uyandana YaggapitiyaRR/RDA/18/25/135/NWP/KRGKelegedara Gamameda Road (CTB Basaya Dawanaya wana) Kavudumunna, Kunumade, Hungan pitiya haraha diwena Margaya Kapat KirimaRR/RDA/18/25/136/NWP/KRGRanasinghe Hotel Asalin Koralaya Waththe sita Panwala Kubura Dakwa Diwena Margaya Kapat KirimaRR/RDA/18/25/12Anura Mahaththayalage niwase sita Nalalida dakwa kadurugaha ela dakwa margaya (Ganewatte)RR/RDA/18/25/05158 Digana Grama niladari wasame 3 patumaga (vawa dakwa) (Yapahuwa)RR/RDA/18/25/23Horagasagara Nawarathna handiye sita Ihala kadigamuwa handiya dakwa margaya (Bingiriya)RR/RDA/18/25/99Rajanganaya reservoir to Parakumpura Junction (Left bank Road)RR/RDA/18/25/06Walaliya Piduruwellewa road to the middle of the villageRR/RDA/18/25/17No. 245 from near Jeevan Lasantha's house no. 37 Development of the main road up to Mr. Nihal's house with five (5) side roads.
+9 more…
Click to filter the awarded table
2.9%
0
Delay
1 / 34 awarded
Delay1
Click to filter the awarded table
26.5%
0
Critical Delay
9 / 34 awarded
Critical Delay9
RR/RDA/18/25/01/NWP/KRGDevelopment of Egodagama Talakolawewa roadRR/RDA/18/25/04/NWP/KRGThe road from Hunugallewa road junction to Madadenigama Hunugallewa Mahamaruwa Beligahaya to Mee Oya bridgeRR/RDA/18/25/07/NWP/KRGRoad from Moragolla Junction to Nabadewa Girilla Carpet Road via KirindaRR/RDA/18/25/09/NWP/KRGPaving the road from Pahala Galapitiyagama to Tharanagolla Sports GroundRR/RDA/18/25/11/NWP/KRGDevelopment of road from Dambulu Road to Havanathenna via EhelagollayaRR/RDA/18/25/22/NWP/KRGPaving of culverts and sidewalls at the necessary places on the road from near Moragane Samiti Hall to Siyambalaweva via Galkadulla.RR/RDA/18/25/137/NWP/KRGDamunugolla Sita Kobbewehera Handiya Dakwa Margaya Kapat KirimaRR/RDA/18/25/138/NWP/KRGPudukkulama Bogas Handiye sita Keppitiya haraha Thihawa Dakwa Margaya Kapat Kirima
+1 more…
Click to filter the awarded table
64.7%
0
Completed
22 / 34 awarded
Completed22
RR/RDA/18/25/02/NWP/KRGRoad from Parakumpura to Yaya 04RR/RDA/18/25/08/NWP/KRGPaving of road from Nammuawa to Nagansole templeRR/RDA/18/25/16/NWP/KRGDevelopment of concrete road from near Wadawa temple to the lakeRR/RDA/18/25/24/NWP/KRGPaving and developing the road from Seelarathana Mawatha to Girana JunctionRR/RDA/18/25/104/NWP/KRGPinnagolla Junction to Kokowaththa Junction VIA AlakolapelessaRR/RDA/18/25/106/NWP/KRGThagahinna Temple RoadRR/RDA/18/25/NWP/KRG/10Uyandana YaggapitiyaRR/RDA/18/25/136/NWP/KRGRanasinghe Hotel Asalin Koralaya Waththe sita Panwala Kubura Dakwa Diwena Margaya Kapat KirimaRR/RDA/18/25/12Anura Mahaththayalage niwase sita Nalalida dakwa kadurugaha ela dakwa margaya (Ganewatte)RR/RDA/18/25/05158 Digana Grama niladari wasame 3 patumaga (vawa dakwa) (Yapahuwa)RR/RDA/18/25/23Horagasagara Nawarathna handiye sita Ihala kadigamuwa handiya dakwa margaya (Bingiriya)RR/RDA/18/25/99Rajanganaya reservoir to Parakumpura Junction (Left bank Road)RR/RDA/18/25/06Walaliya Piduruwellewa road to the middle of the villageRR/RDA/18/25/17No. 245 from near Jeevan Lasantha's house no. 37 Development of the main road up to Mr. Nihal's house with five (5) side roads.RR/RDA/18/25/21Wattakkawatta Road - Paving of Road (ABC Paving) from near Kelimune Pustalaya.
+7 more…
Click to filter the awarded table
Portfolio Breakdown · North Western Province · Kurunegala · District
Avg Physical Progress per EE Division · North Western Province · Kurunegala
At-Risk Projects · North Western Province · Kurunegala
- RR/RDA/18/25/09/NWP/KRGPaving the road from Pahala Galapitiyagama to Tharanagolla Sports GroundDelay246 Days in Delay · 0%
- RR/RDA/18/25/137/NWP/KRGDamunugolla Sita Kobbewehera Handiya Dakwa Margaya Kapat KirimaDelay212 Days in Delay · 45%
- RR/RDA/18/25/138/NWP/KRGPudukkulama Bogas Handiye sita Keppitiya haraha Thihawa Dakwa Margaya Kapat KirimaDelay211 Days in Delay · 20%
- RR/RDA/18/25/01/NWP/KRGDevelopment of Egodagama Talakolawewa roadDelay182 Days in Delay · 60%
- RR/RDA/18/25/07/NWP/KRGRoad from Moragolla Junction to Nabadewa Girilla Carpet Road via KirindaDelay176 Days in Delay · 75%
- RR/RDA/18/25/139/NWP/KRGAkkara Panaha Mansandiye Sita Walahamulla Dakwa MargayaDelay170 Days in Delay · 90%
- RR/RDA/18/25/135/NWP/KRGKelegedara Gamameda Road (CTB Basaya Dawanaya wana) Kavudumunna, Kunumade, Hungan pitiya haraha diwena Margaya Kapat KirimaDelay168 Days in Delay · 20%
- RR/RDA/18/25/22/NWP/KRGPaving of culverts and sidewalls at the necessary places on the road from near Moragane Samiti Hall to Siyambalaweva via Galkadulla.Delay153 Days in Delay · 65%
- RR/RDA/18/25/04/NWP/KRGThe road from Hunugallewa road junction to Madadenigama Hunugallewa Mahamaruwa Beligahaya to Mee Oya bridgeDelay148 Days in Delay · 40%
- RR/RDA/18/25/11/NWP/KRGDevelopment of road from Dambulu Road to Havanathenna via EhelagollayaDelay126 Days in Delay · 65%
- Wijekoon Mawatha near Narammala Bus Stand and Hospital Mawatha from PeralaswellaDelay94 Days in Delay · 65%
Portfolio Timeline· 29 scheduled projects · North Western Province · Kurunegala Toggle
2025-06-21 today2026-11-04
Portfolio · Awarded Works
Awarded Projects
22 projects
Filter awarded works
22 matching projects1 active
| # | Contract No. | Package No. | Contract Name | Progress | LOA Amount | Estimate Amount | Status |
|---|---|---|---|---|---|---|---|
| 1 | RR/RDA/18/25/02/NWP/KRG | RR/RDA/18/25/02 | Road from Parakumpura to Yaya 04 | 100% | 20,126,522.24 | 24,748,740.38 | Awarded |
| 2 | RR/RDA/18/25/08/NWP/KRG | RR/RDA/18/25/08 | Paving of road from Nammuawa to Nagansole temple | 100% | 33,899,382.00 | 49,176,148.86 | Awarded |
| 3 | RR/RDA/18/25/16/NWP/KRG | RR/RDA/18/25/16 | Development of concrete road from near Wadawa temple to the lake | 100% | 25,583,393.00 | 31,595,236.77 | Awarded |
| 4 | RR/RDA/18/25/24/NWP/KRG | RR/RDA/18/25/24 | Paving and developing the road from Seelarathana Mawatha to Girana Junction | 100% | 37,201,129.80 | 57,963,603.67 | Awarded |
| 5 | RR/RDA/18/25/104/NWP/KRG | RR/RDA/18/25/104 | Pinnagolla Junction to Kokowaththa Junction VIA Alakolapelessa | 100% | 24,010,872.60 | 30,550,483.75 | Awarded |
| 6 | RR/RDA/18/25/106/NWP/KRG | RR/RDA/18/25/106 | Thagahinna Temple Road | 100% | 13,370,813.50 | 16,225,030.21 | Awarded |
| 7 | RR/RDA/18/25/NWP/KRG/10 | RR/RDA/18/25/107 | Uyandana Yaggapitiya | 100% | 45,801,928.20 | 71,428,674.02 | Awarded |
| 8 | RR/RDA/18/25/136/NWP/KRG | RR/RDA/18/25/136 | Ranasinghe Hotel Asalin Koralaya Waththe sita Panwala Kubura Dakwa Diwena Margaya Kapat Kirima | 100% | 21,718,130.50 | 22,994,794.21 | Awarded |
| 9 | RR/RDA/18/25/12 | — | Anura Mahaththayalage niwase sita Nalalida dakwa kadurugaha ela dakwa margaya (Ganewatte) | 100% | 23,242,484.20 | 23,242,484.20 | Awarded |
| 10 | RR/RDA/18/25/05 | — | 158 Digana Grama niladari wasame 3 patumaga (vawa dakwa) (Yapahuwa) | 100% | 11,774,916.28 | 11,443,000.00 | Awarded |
| 11 | RR/RDA/18/25/23 | — | Horagasagara Nawarathna handiye sita Ihala kadigamuwa handiya dakwa margaya (Bingiriya) | 100% | 61,588,475.92 | 61,588,475.92 | Awarded |
| 12 | RR/RDA/18/25/99 | — | Rajanganaya reservoir to Parakumpura Junction (Left bank Road) | 100% | 312,810,182.55 | 312,810,182.55 | Awarded |
| 13 | RR/RDA/18/25/06 | — | Walaliya Piduruwellewa road to the middle of the village | 100% | 19,431,074.96 | 19,537,451.95 | Awarded |
| 14 | RR/RDA/18/25/17 | — | No. 245 from near Jeevan Lasantha's house no. 37 Development of the main road up to Mr. Nihal's house with five (5) side roads. | 100% | 51,911,526.67 | 51,911,526.67 | Awarded |
| 15 | RR/RDA/18/25/21 | — | Wattakkawatta Road - Paving of Road (ABC Paving) from near Kelimune Pustalaya. | 100% | 39,422,351.32 | 39,422,351.32 | Awarded |
| 16 | RR/RDA/18/25/103 | — | Wellawa Thalatuwa Junction to Gepellawa Road | 100% | 31,387,050.89 | 31,387,050.89 | Awarded |
| 17 | RR/RDA/18/25/105 | — | Thihawa Junction to Mailamada | 100% | 33,866,057.61 | 33,866,057.61 | Awarded |
| 18 | RR/RDA/18/25/314 | — | Road from Nugawela Junction in Walagane to Maspotha Crematorium via Temple | 100% | 41,562,875.57 | 41,562,875.57 | Awarded |
| 19 | RR/RDA/18/25/317 | — | Lakee Land Road in Wilattawa Division | 100% | 9,799,762.91 | 9,799,762.91 | Awarded |
| 20 | RR/RDA/18/25/319 | — | Kabaledevgama 3rd Lane and 4 Lane in Kaballewa Division of Kaballewa Division | 100% | 21,709,247.87 | 21,709,247.87 | Awarded |
| 21 | RR/RDA/18/25/311 | — | Road from Kopihena Junction to Dangolla in Damunugala Division of Piduruwella Division | 100% | 55,494,114.67 | 55,494,114.67 | Awarded |
| 22 | RR/RDA/18/25/312 | — | Junction in front of Narampola Thoraya Muslim College to Budanapartiya Road via Narampola | 100% | 43,368,925.99 | 43,368,925.99 | Awarded |
Showing 1–22 of 22
Source: DRRRP • 40 projects • Data updated 2026-11-02 10:30 • 16:46:40 System live • Sri Lanka • 1 districts